Building & Site Design for 3038sf neighborhood grocery and restaurant re-build on 1/4-acre lot on the west side of Washington, IN. Worked with the owner every step of the way, through city variances, city site approval, and state building plan review. Site Design included parking & building layout, earthwork & grading, utility service, and stormwater detention. Building Design included conceptual layout & planning, phasing to allow continued use of the existing store during construction of the new store, life safety & code analysis, concrete foundations, wood framing, split system heating & cooling, waste & supply plumbing, electric power & lighting, kitchen equipment layout, and special structural support for kitchen hood & make-up air unit. Also assisted the owner with writing up bid documents and soliciting bids from local contractors. Designed 2018-2019. Built 2018-2020.
Site Design for 100-acre Industrial Property Renovation. Site Design included 3 miles of underground utility relocations, 1.5 miles of new roadways, 8.5 acres of parking, 50 acres of grading & drainage modifications, and 2 stormwater retention basins. Deliverables included Site Layout, Utility Design, Earthwork & Grading Design, Roadway & Pavement Design, Erosion Control Design, Drainage Design, and City Coordination & Approvals. Design 2018-2020. Built 2018-2021+/-.
Before
During
After
Before
After
Site Design for convenience stores and diesel truck lots on 1/2-acre to 5-acre properties across Indiana, Illinois, & Kentucky. Site Design typically includes parking-store-canopy layout on lot, earthwork & grading, utility service, stormwater detention, stormwater pollution prevention, landscaping, site lighting, and state highway driveway permitting. Various Designs 2017-2026.
Building Design as part of Design-Build Contract with Local Builder. The City & County had worked with another designer for Site & Landscaping Design, as well as conceptual building planning. The Builder was responsible for the final design and engineering of the individual pavilion buildings throughout the park. Building Design for (4) structures included, foundations, framing, life safety & code analysis, plumbing, and state building permitting. Designed 2023-2024. Built 2023-2024.
Site & Building Design for 101,450sf Warehouse Addition at Existing Industrial Site. Site Design included trailer parking & building layout, coordination with utility companies regarding existing easements, earthwork & grading, stormwater detention, stormwater pollution prevention, and local permitting. Building Design included foundations, loading dock layout, light gauge steel & structural steel framing for sloped walkway from existing to new warehouse, life safety & code analysis, electrical, and mechanical. Designed 2022-2023. Built 2023-2024.